Apr 01, 2017 · The maximum haul was 750 feet and the average 500 feet. Although the track was good and the grade favorable, 8 men on each of two shifts, 16 in all, using 1-ton cars, were required to load, tram, and dump the ore, thus averaging 25 tons per man-shift.